A Practical Guide to IQ, OQ, & PQ Protocols

In regulated industries like pharmaceuticals and biotech, the standard for critical equipment is extremely high. For any piece of equipment that can impact product quality or patient safety—especially critical systems like ultra-low temperature (ULT) freezers—you must have objective, documented proof that it works exactly as intended, every single time. This rigorous process of proof is known as validation, and it is a cornerstone of Good Manufacturing Practice (GMP).

For those new to the field or looking for a refresher, the acronyms can be daunting. However, understanding the fundamentals of Installation Qualification (IQ), Operational Qualification (OQ), and Performance Qualification (PQ) is essential for anyone responsible for maintaining a compliant facility. This guide will demystify these protocols and explain why they require a level of expertise that goes far beyond standard equipment service.

man working in manufacturing

Demystifying the Acronyms: The Three Pillars of Validation

Validation is a systematic process, typically broken down into three distinct phases. NWR's "Expert Validation Services" specialize in guiding clients through each one to ensure they meet the stringent guidelines of the FDA and other international regulatory bodies.

  • Installation Qualification (IQ): "Did we get what we paid for?"
    The IQ phase is the foundational step. It verifies and documents that the equipment and all its components have been delivered and installed correctly, according to the manufacturer's specifications and the user's design requirements. This includes checking that all necessary documentation (like manuals and drawings) is present, verifying utility connections (power, etc.), and confirming that all materials of construction are as specified. It is the baseline proof that the physical system is correct.

  • Operational Qualification (OQ): "Does it work correctly?"
    Once the installation is verified, the OQ phase tests the equipment to ensure it operates correctly without any load. This involves systematically testing every function of the freezer. For a ULT freezer, this would include testing its ability to reach and hold its temperature setpoint, verifying that alarms (for high/low temperature, power failure) function as expected, and testing the system's recovery time after a door opening. The OQ provides documented evidence that the freezer's operational functions perform within pre-defined limits.

  • Performance Qualification (PQ): "Does it work correctly for our process?"
    The final and most critical phase is the PQ. This phase tests the freezer's performance under real-world, "worst-case" conditions. This means testing it with a full load of actual or simulated product over an extended period. The goal of the PQ is to prove that the freezer can consistently and reliably maintain the required temperature environment for your specific process, even with the thermal challenges presented by a full product load. This is the ultimate proof that the system is fit for its intended purpose.

Why Generalist Technicians Are Not Validation Experts

Successfully executing IQ, OQ, and PQ protocols requires a deep, integrated knowledge of both the equipment itself and the complex web of regulatory guidelines that govern it. This is not a simple checklist that a standard HVAC technician can follow. It is a highly specialized discipline that requires training in GMP, documentation practices, and risk assessment. A validation expert from NWR understands how to write the protocols, execute the tests, analyze the data, and compile the final report in a way that will withstand the scrutiny of a regulatory audit. Entrusting this critical task to anyone less than a specialist is a risk to your compliance, your product, and your reputation.

Is your critical equipment truly compliant? Trust the validation experts. Contact NWR to discuss your IQ, OQ, and PQ strategy and ensure your facility is audit-ready.

Previous
Previous

The AIM Act and What It Means For The Industry

Next
Next

Streamlining Your Cold Chain Management